Stop 06 of 09 · Building

What happens at commissioning?

About 6 min · 3 questions ·

Fridaymonth 9
The situation

The transformer station is ready, the chargers are mounted, the bays painted. Today the grid operator connects the site.

By the evening, the first car should be able to charge.

The questionWhat has to happen between energising the site and the first session?

One day, six stepsFrom built to available
01
Step 01Energisation

The grid operator switches on the medium-voltage connection. From here on, the site is live.

Select each step to see what happens.

Visible through data

Since 14 April 2025, every Member State must have an , appointed under , that issues ID codes to charge point operators and mobility service providers. Operators must also make the static and dynamic data of their public charge points available free of charge, through an interface reported to the .

A hub that is built but not published is, for drivers, not there.

What can go wrong on the day

  • The backend does not see a charger: a wrong address or certificate in the configuration.
  • A test car cannot start: car and charger disagree during the start; the next test car shows whether it is the car or the charger.
  • Wrong data in apps: a price or a connector type entered incorrectly, which reaches every app that uses the data.

Tests with several different cars catch most of these before the first customer does.

Check your understanding

3 questions. Answer all of them to complete this stop. Each answer explains itself.

01Question 1 of 3

What is the first step of commissioning day?

02Question 2 of 3

Why do test sessions use several different cars?

03Question 3 of 3

Who issues the ID codes for charge point operators in each EU Member State?