Why does a charging hub need its own transformer?
Large hubs connect at medium voltage, in Germany 10 to 30 kV, above the 400-volt street grid. The transformer that steps the voltage down for the chargers then becomes part of the site.
Explained in
Why does the grid connection decide so much?From 250 kVA to 1.2 MW: why a fast-charging hub usually needs a medium-voltage connection with its own transformer, and what the grid operator's role is.The distribution system operator checks whether its grid can carry the new load, offers a connection and builds its part. EU law requires Member States to make connecting charge points easier and requires grid operators to cooperate on a non-discriminatory basis with any company that builds or runs them.
Terms
Related questions
- How many public charge points are there in Europe?More than 1.1 million in the EU alone: the European Alternative Fuels Observatory counted 1,159,838 public recharging points in August 2026. The map on this site covers part of the network: 839,000 public charge points at 227,000 sites across Europe, from national registries and OpenChargeMap.
- How far apart are fast chargers on EU motorways?Along the TEN-T core network, AFIR requires a charging pool at least every 60 km in each direction: 400 kW by the end of 2025, 600 kW by the end of 2027.
- What does it take to build a charging hub?A site host, a grid connection, an energy supply contract, a building permit and backend and roaming partners. Most steps depend on each other, so the developer in this path starts the grid connection first.
- What is utilisation of a charger?The energy a charger delivers compared with what it could deliver at full power all year. Because most costs are fixed, it decides whether a site pays back.
- EUR-Lex: Directive (EU) 2019/944 on common rules for the internal market for electricity, Article 33. https://eur-lex.europa.eu/eli/dir/2019/944/oj. Checked 09 Oct 2026. © European Union, reused under Commission Decision 2011/833/EU.