What does it take to build a charging hub?

A site host, a grid connection, an energy supply contract, a building permit and backend and roaming partners. The grid connection is usually the slowest step.

Explained in

Charging infrastructure · Stop 03Which permits and contracts does a site need?Lease, grid connection, energy supply, building permit, backend and roaming: the agreements behind one charging hub, and who signs them.

Most steps depend on each other. Without a lease, no grid operator reserves capacity; without capacity, no permit makes sense; without a permit, nothing is built. Developers therefore start the slowest steps first, usually the grid connection, and secure the land early.

From “The order matters”, stop 03

Terms

  1. RoamingCharging in another company's network with your own card or app.
  2. Site hostThe owner of the location, who provides the parking spaces for the chargers.
  3. LeaseThe contract that lets an operator use a site's parking bays and space for its chargers for a fixed term, often ten years or more, in return for rent or a revenue share.
  1. How far apart are fast chargers on EU motorways?Along the TEN-T core network, AFIR requires a charging pool at least every 60 km in each direction: 400 kW by the end of 2025, 600 kW by the end of 2027.
  2. Why does a charging hub need its own transformer?A megawatt at 400 V needs about 1,700 A. At medium voltage the current is a fiftieth of that, so large hubs connect there with their own transformer.
  3. What is utilisation of a charger?The energy a charger delivers compared with what it could deliver at full power all year. Because most costs are fixed, it decides whether a site pays back.
  4. What is in a grid connection offer?The connection point, the agreed capacity, a one-off contribution and the cable cost, the grid fees with their capacity and energy price, the timeline and the conditions. The deep dive reads a composed offer line by line.