How far apart are fast chargers on EU motorways?
Along the TEN-T core network, AFIR requires a charging pool at least every 60 km in each direction: 400 kW by the end of 2025, 600 kW by the end of 2027.
Explained in
How is a site chosen?Traffic, length of stay, grid capacity and a willing site host: what makes a location work for charging, and what EU law expects along the motorways.AFIR obliges Member States to ensure a minimum: pools every 60 km along the core network, and public power that grows with the number of electric cars. Where exactly a hub stands is decided by the companies that build and run it, guided by traffic, grid and land.
Terms
- AFIRAlternative Fuels Infrastructure Regulation (EU) 2023/1804: EU rules for public charging, from payment to coverage.
- Charging poolAFIR's term for one or more charging stations at a specific location, counted together for the targets along the main roads.
- TEN-TThe trans-European transport network, the EU's main roads and corridors, divided into a core and a comprehensive network; AFIR sets charging targets along it.
Related questions
- Why does a charging hub need its own transformer?A megawatt at 400 V needs about 1,700 A. At medium voltage the current is a fiftieth of that, so large hubs connect there with their own transformer.
- What does it take to build a charging hub?A site host, a grid connection, an energy supply contract, a building permit and backend and roaming partners. The grid connection is usually the slowest step.
- What is utilisation of a charger?The energy a charger delivers compared with what it could deliver at full power all year. Because most costs are fixed, it decides whether a site pays back.
- EUR-Lex: Regulation (EU) 2023/1804 (AFIR), Articles 3, 5 and 20 and recital 38. https://eur-lex.europa.eu/eli/reg/2023/1804/oj. Checked 09 Oct 2026. © European Union, reused under Commission Decision 2011/833/EU.