Stop 09 of 09 · Behind the scenes

One charging session, fully understood

About 7 min · 4 questions · Energy · Data · Money ·

Tuesdayone last time
The situation

The motorway service station. Same driver, same charger, same tap.

After eight stops, the two seconds and the twenty minutes look different: you know who is involved and what flows.

The questionCan you describe the whole session: who acts, what flows, and why each part exists?

Guess firstThe display shows “Preparing…” for a few seconds. What comes to mind now?RevealHide

Safety check, negotiation, precharge, all normal. If that comes to mind right away, the model is in place. Knowing what lies behind each pause, each price and each status light is the aim of this path.

Three flows, one sessionDescribe every step

Data: every step of the authorisation.

01
Step 01 · 2:02:31 PMTap

The charger reads the RFID card and sends an OCPP Authorize message to its backend.

Switch the flow, then select each step. Prices are an illustrative example.

The 22 minutes, narrated properly

  1. Arrival at a site built on an agreement between a and a , along a road with EU coverage targets, behind a grid connection approved long before.

    Stops 02, 07, 08
  2. The tap. to the operator's backend, to the card provider's side, the approval back within about two seconds.

    Stop 03
  3. Energy flows after the safety check, with the station converting and the battery setting the pace.

    Stop 04
  4. The power falls. The driver knows the charging curve and unplugs at 80%.

    Stop 04
  5. A is created, travels the route and becomes one line on next month's invoice, margin included.

    Stop 05
  6. Had something gone wrong, a control room would first have checked it remotely.

    Stop 06

Three flows. Many companies. Four standards. One tap.

One session, three flowsTuesday, 2:02 to 2:24 PM
EnergyGrid to battery
240 kW90 kW
DataCharger and backends
Tap and startMeter valuesCDR
MoneyAfter the CDR
Invoice
2:022:102:182:24Later

Energy and data run while the car charges. The session closes with the CDR, and only then do settlement and the invoice follow. Power values follow the example session.

Where to go from here

You have the map now. Further learning paths go deeper into each part of this journey: the hardware itself, OCPP in depth, OCPI and roaming, payments and billing and the grid. Each of them builds on the session you now know. See all learning paths.

Check your understanding

4 questions. Answer all of them to complete this stop. Each answer explains itself.

01Question 1 of 4

The session's authorisation crossed company borders. Which protocols carried it, in order?

02Question 2 of 4

The power fell at 80% and the driver unplugged. Why was that a sensible choice?

03Question 3 of 4

Leaving VAT aside, the 0.64 €/kWh the driver pays and the wholesale rate the CPO receives differ. That difference is…

04Question 4 of 4

What is the most durable thing this path taught?

Was this helpful?