Stop 09 of 09 · In service

One charger, fully understood

About 6 min · 4 questions ·

Monday
The situation

The inspection is done. Six chargers checked, one module replaced, a third DC charger waiting for commissioning.

Cars come and go at the hub, and none of the drivers noticed anything.

The questionCan you explain everything the technician saw this morning?

The morning in eight moments

  1. Slim AC charge points at the hotel, large DC chargers by the road: the conversion happens in the car or in the charger.

    Stop 01
  2. Behind the door of charger 1: , , . Power is voltage times current.

    Stop 02
  3. sockets at AC, fixed cables at DC, as requires.

    Stop 03
  4. One down, the charger still charging at lower power. Modules, meter, controller, cooling.

    Stop 04
  5. Two cars on one 300 kW charger. The controller moves power to where it is needed.

    Stop 05
  6. A light AC cable, a heavy cooled DC cable: current sizes the cable, heat grows with its square.

    Stop 06
  7. A new charger arrives: conformity, metering, grid connection, commissioning, data.

    Stop 07
  8. Full power again after twelve hours at reduced power. What counts, and what it allows.

    Stop 08

Eight moments, one hub. Every part of a charger answers to physics, to the car and to the law.

Where to go from here

The charger is one part of a site. Charging infrastructure follows a hub from planning to opening, load management the sharing of one grid connection, and OCPP in depth the messages between charger and backend. See all learning paths.

Check your understanding

4 questions. Answer all of them to complete this stop. Each answer explains itself.

01Question 1 of 4

Why is the AC charge point at the hotel so much smaller than the DC charger?

02Question 2 of 4

Charger 2 lost one power module. What did drivers notice?

03Question 3 of 4

What decides the size of a charging cable?

04Question 4 of 4

From when do EU-wide metering rules for chargers apply?