Substation
A facility of the grid operator that transforms electricity between voltage levels; its spare capacity decides how quickly a large new connection, such as a depot, can be supplied.
Explained in
How is a depot planned?Routes, energy per night, the time window and the grid connection: how a depot's charging is sized, and how much spreading the load over the night saves.For those depots, the IEA notes that poorly optimised charging can significantly increase peak power demand, raising costs and lengthening grid connection timelines; in some cases, shifting part of the load can cut maximum depot demand by up to 60%. For large depots, grid connection is often one of the longest parts of the project: limited substation capacity, permits and reinforcements can delay depots by several years. How a controller divides limited power between vehicles is explained in Load management, stop 04.
Also in
Related terms
- IEA: Global EV Outlook 2026: Electric vehicle charging. https://www.iea.org/reports/global-ev-outlook-2026/electric-vehicle-charging-chap-6-and-10. Checked 09 Oct 2026. Licence: CC BY 4.0.
- IEA: Global EV Outlook 2026: Electric vehicle charging. https://www.iea.org/reports/global-ev-outlook-2026/electric-vehicle-charging-chap-6-and-10. Checked 09 Oct 2026. Licence: CC BY 4.0.