EPBD

The EU directive on the energy performance of buildings; its 2024 recast sets charge points, pre-cabling and a right to install for buildings.

Explained in

Regulations and compliance · Stop 06What must buildings provide for charging?Charge points per parking space, pre-cabling and the right to install a wallbox: what the recast Energy Performance of Buildings Directive asks of new and renovated buildings.

Also in

  1. Fleet charging · Stop 02Where do fleet vehicles charge?The office car park
  1. Pre-cablingCabling installed in advance at a parking space, so a charge point can be added later without new works.